![[AFL] Architecture Frédéric Lebard](img/logo.gif)
> Construction of a plant, offices and storage
> Parc d'activité Stelytec (42)
> Status : completed
The merger of two compagnies led to a reengineering of the industrial processes.
The firm led preliminary studies and picked a site, visible from the highway. The scale of the building was of utmost importance. The building structure facilitates the production flows.